Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: Jutilar Grogis
Country: Solomon Islands
Language: English (Spanish)
Genre: Travel
Published (Last): 3 November 2018
Pages: 110
PDF File Size: 10.85 Mb
ePub File Size: 12.31 Mb
ISBN: 356-1-26509-467-5
Downloads: 74596
Price: Free* [*Free Regsitration Required]
Uploader: Akira

To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water.

For this reason it is advisable to carry out the pressure test over a period of at least 24 hours. The pressure must be brought back to the test level at regular intervals and in any case after a drop of 0.

This applies in particular to pipelines with mechanical socket connections. The water loss method see DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above.

  ESPIROMETRIA INTERPRETACION PDF

Hydrostatic testing — CEPS a.s.

Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely watertight. Drucken Teilen Xing Twitter.

There are two basic test methods: It is carried out over a period of 3 hours for pipes up to DN Each pipeline must be subjected to a pressure test after it has been laid. The test sections must be defined so that:.

Pressure test

The pipeline is to be tested over its entire length or, if necessary, in sections. Before starting the test, dvtw pipeline must be slowly and evenly filled with water at a rate of dbgw 0. Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks.

The test sections must be defined so that: Determines the amount of air still in the pipeline. The pressure test must be carried out in compliance with the requirements laid down in the relevant rules and regulations, e.

  BOGUSAW PIETRZAK SYSTEM FINANSOWY W POLSCE PDF

Carry out as specified by the planner Main test: The pressure test is carried out in a maximum of three steps. The pressure loss may amount to:. Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations.

The pressure loss may dvgs to: The joints need not be covered by backfill. The main test is a test of the entire system, and in particular of the watertightness and proper execution and installation of the pipes, fittings, etc.