Summer Training Presentation of BHEL Block Limited Ranipur, Haridwar ( Uttrakhand) Submitted To: Mr. XYZ Submitted By: ABC Roll No. Who give me lot of inspiration and skills to complete this Report successfully. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. .. 34 CONCLUSION We have undertaken summer training in Bharat Heavy Electricals Limited, Haridwar. View Test Prep – from MECHANICAL I thankfully acknowledge the staff of BHEL, Haridwar for giving me so much co- (Sr. Manager,TUM Block-3) to support me during my Industrial Training. . I cannot even describe how much Course Hero helped me this summer.

Author: Nikora Tojakus
Country: Australia
Language: English (Spanish)
Genre: Literature
Published (Last): 6 June 2011
Pages: 339
PDF File Size: 5.79 Mb
ePub File Size: 2.14 Mb
ISBN: 232-4-53538-919-6
Downloads: 84967
Price: Free* [*Free Regsitration Required]
Uploader: Yozshushicage

Bhel Haridwar training ppt

L-shaped strip of laminated epoxy glass fiber with nomex filter are used for slot insulation. Its operations are spread over 11 manufacturing plants and number of engineering and service divisions located across the country.

Ghel passage of constant cross-section area.

The rotor houses the field winding. This depends on the type of exciter viz.

Blade passage of varying cross-section area. Rotor is inserted in the stator and assembly of end shields, bearings etc. The rotor retaining rings withstand the centrifugal forces due to end winding.

  ADEMCO 5869 PDF

Inner and sidewalls are suitably blanked to house for longitudinal hydrogen gas coolers inside the stator body.

To compute potier reactance Xd. Diesel Generating Sets v.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

To determine total leakage reactance Xl. The rear end of above exciter armature is mounted with a permanent magnet generator rotor. As a result, they have been adopted widely in the fan and compressor stages of the gas turbine for both disc and blade applications. The end stator summee packets and core clamping and is intensively cooled by through special ventilation system.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR – ppt video online download

The core loss test is done after completion of core assembly. Power generating setIndustrial turbo — sets, CompressorsPumps and heatersBow — millsHeat exchangers oil ringsGas turbinesSwitch gears.

BHEL Haridwar has two manufacturing plants: Two computerized test beds to test large size generators up to MW. Consistent performance in a highly competitive environment enabled BHEL attain the coveted ‘Maharatna’ fraining in Erection commissioning, operation and maintenance service vi. Indication of liquid level in the generator and alarm in case of high level.

Segments are stamped out with accurately finished die from the sheets of cold rolled high quality silicon steel.

Bhel Haridwar training ppt

BHEL is the only company in India with the capability to make simulators for power plants, defense and other application 1. The conductors of small rectangular cross section are provided with glass lapped strand insulation.

  LUNA BY SHIV KUMAR BATALVI PDF

Bearing have provision for vibration pickup to monitor shaft vibration. Series and Shunt Compensation Systems have also been developed and introduced to minimize transmission losses. The enthalpy of the steam decreases. Urban transportation systems iii. Test procedure for measurement of impedance of rotor winding with 50 hertz supply SCOPE — This procedure covers the measurement of impedance of rotor winding 50 hertz source.

Total weight of turbo generator: These include high voltage power and distribution transformers, instrument transformers, dry type transformers, SF6 switchgear, capacitors, and insulators etc.

Bhel haridwar summer training ppt Engineering. The steam velocity increases. The number of layers or thickness glock insulation depends on the machine voltage. They are employed with guide vans on inner side for ensuring uniform distribution of air or gas.

Bay 1 and 2: Center lathe machine up to maximum length of 16 m and diameter aummer 3. Enter the email address you signed up with and we’ll email you a reset link.